HVOF/Reservoir Cleaning/Oil Filtration | Harvey Gulf | Port Fourchon, LA

After a piston pump failure on 165mT crane onboard a Multi-purpose Supply Vessel introduced ferus debris throughout the piping system and into the oil reservoir, IFM was contracted to remove the debris in the piping, filter the oil to 16/14/11, and clean the reservoir! Due to not being able to utilize the crane, the vessel was forced to return to port. IFM was able to complete all work and have the vessel back underway within four days.

Comments are closed.